Multiquip GA6HZR Manuel d'utilisateur Page 18

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 70
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 17
PAGE 18 — GA-6HZR A.C. GENERATOR— OPERATION AND MANUAL — REV. #3 (03/30/11)
Generator Storage
For storage of the generating set for over 30 days, the
following is required:
Drain the fuel tank completely.
Run the engine until the gasoline in the carburetor is
completely consumed.
Completely drain the oil from the crankcase and refill
with fresh oil.
Remove the spark plug, pour 2 or 3 cc of SAE 30 oil
into the cylinder and crank slowly to distribute the oil.
Slowly rotate the engine a few times with the starter
Rope and install a new plug.
Pull out the starter rope slowly and stop at the
compression point.
Clean all external parts of the generating set with a cloth.
Cover the generating set and store in a clean, dry place.
GA-6HZR — PREPARATION FOR LONG -TERM STORAGE
Vue de la page 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 69 70

Commentaires sur ces manuels

Pas de commentaire